NCPSI Project Portfolio: Substations, Transmission Lines & Industrial Power Systems
Owner: All
Subcontractor: All
Location: All
| Project Name | Owner | Subcontractor | Location | Cost | Start Date | End Date |
|---|---|---|---|---|---|---|
| Supply of Labor, Tools, Materials and other incidentals for the reconfiguration of Toledo Power Company (TPC), Coal and Ash Handling (CAH) Electrical Systems | MGEN/Toledo Power Company | Aboitiz Construction, Inc. | Daan Lungsod, Toledo City, Cebu | ₱26,760,000 | 2025-02-28 | 2025-08-30 |
| Electrical Works – Fast Tayud Warehouse Projects – Phase 1 | Fast Tayud Logistics Corp. | Aboitiz Construction, Inc. | Tayud, Consolacion, Cebu | ₱27,400,000 | 2024-02-08 | 2024-10-30 |
| Governor Celestino Gallares Memorial Hospital Electrical Works | Governor Celestino Gallares | Montaño Construction Development Corporation | Malayo-Sur, Cortes, Bohol | ₱29,700,000 | 2023-11-29 | 2024-10-05 |
| Supply of Labor, Materials, Tools and Equipment for the Electrical Power Distribution System at UP-Lahug, Cebu | University of the Philippines | JY Bontilao Construction Services | Lahug, Cebu City, Cebu | ₱17,900,000 | 2023-07-24 | 2024-12-30 |
| Engineering, Procurement, Construction, Testing and Commissioning of Electrical Transformers and Control Components, Primary and Secondary Lines for TY8 Expansion Projects | Cebu Mitsumi, Inc. | Testech Inc. | Sabang, Danao City, Cebu | ₱46,500,000 | 2022-03-28 | 2023-03-31 |
| Installation of Electrical Equipment for the 7.9 MW Solar PV Systems | Cebu Mitsumi, Inc. | Primary Structures Corp. | Sabang, Danao City, Cebu | ₱2,300,000 | 2023-08-05 | — |
| Pipe Laying of HDPE Pipes | General Milling Corp. | — | Pajo, Lapu-lapu City, Cebu | ₱400,000 | 2023-06-06 | 2023-10-30 |
| Relocation/Installation of Solar Panel Systems | General Milling Corporation | — | ML Quezon National Highway, Lapu-lapu City, Cebu | ₱533,000 | — | — |
| Construction of Powerhouse and Installation of High Bay Lights | Aquilini Mactan Renewable Energy, Inc. | JBR Electro-Mechanical Services | Cebu Light Industrial Park, Lapu-lapu City, Cebu | ₱6,300,000 | 2019-09-01 | 2021-12-31 |
| Power Supply Line and Other Associated Installations for the Additional Compressor at CEDC – Toledo | Global Business Power | — | Toledo City, Cebu | ₱3,400,000 | 2023-06-01 | — |
| PMS of Electrical Equipment, Tower 1, Tower 2, and Tower 3 | Marco Polo Condominium Residences Association | — | Nivel Hills, Cebu City | ₱600,000 | 2023-08-11 | 2023-08-11 |
| Repair and Refill of M1 Switchgear SF6 Gas Tank | Filinvest | — | IL Corso, South Road Properties, Cebu | ₱431,000 | — | — |
| Rehabilitation of Along Calungcalung – Asturias 69 kV Line | National Grid Corporation of the Philippines (NGCP) | Philmar Construction Corporation | Toledo City – Asturias, Cebu | ₱1,600,000 | 2019-07-01 | 2019-12-31 |
| Construction of Laydown Area and Installation of 150 MVA Transformer at Compostela Substation | National Grid Corporation of the Philippines (NGCP) | Philmar Construction Corporation | Canamacan, Compostela, Cebu | ₱16,800,000 | 2020-11-03 | 2020-11-23 |
| Annual Preventive Maintenance of Power Transformer (7500KVA & 900KVA) | CAMPCOR | — | Brgy. Teguis, Poro, Cebu | ₱315,000 | 2022-11-05 | 2022-11-05 |
| Construction of Laydown Area and Installation of 2 x 20 MVA Transformer at Daanbantayan Substation | National Grid Corporation of the Philippines (NGCP) | Philmar Construction Corporation | Talisay, Daanbantayan, Cebu | ₱5,300,000 | 2021-04-16 | 2021-08-17 |
| Construction of Fire Wall, Transformer Foundation, Cable Trench and Water Oil Separator including Installation and Positioning of 150 MVA Transformer | National Grid Corporation of the Philippines (NGCP) | Maxipro Dev't Corp. / Fujian Yongfu | Calbayog, Maasin, Tabango and Paranas Substations | ₱15,000,000 | 2021-11-18 | 2022-05-30 |
| Supply, Delivery, Installation and Commissioning of Revenue Power Meter | Camotes Power Corp. | AV Garcia Power Systems Corp. | Pilar and Poro Diesel Power Plant, Camotes Island, Cebu | ₱700,000 | 2021-05-08 | 2021-06-30 |
| Preventive Maintenance Servicing such as Transformers, Medium Voltage Switchgears, Other Substation Equipment | S.I. Power Corp. | — | Candanay Sur, Siquijor and Lazi, Siquijor | ₱810,000 | 2021-05-20 | 2021-05-22 |
| Design and Installation of Grounding System and Installation, Termination, Testing and Commissioning of XLPE and Control Cables, Motor Control Centers, Switchgears and Cable Trays | SIPCOR | Linergy Construction Corporation | Candanay Sur, Siquijor | ₱3,800,000 | 2020-01-01 | 2021-03-31 |
| Tailings Disposal System Pump Station | Carmen Copper Corp. | Aboitiz Construction Int'l & HVL Engineering Services | Don Andres Soriano, Lutopan, Toledo City, Cebu | ₱2,600,000 | 2019-02-01 | 2019-08-31 |