Cebu Mitsumi 7.9 MW Solar PV — Electrical Works
Electrical installation, testing, and commissioning for Cebu Mitsumi's 7.9 MW solar PV system in Danao — as subcontractor to Primary Structures Corp.
August 29, 2026
Electrical installation, testing, and commissioning for Cebu Mitsumi's 7.9 MW solar PV system in Danao — as subcontractor to Primary Structures Corp.
NCPSI installed the electrical equipment for the 7.9 MW solar PV system at Cebu Mitsumi, Inc. in Sabang, Danao City — engaged as electrical subcontractor to Primary Structures Corp.
Scope of works
No images in this category.