Cebu Mitsumi 7.9 MW Solar PV — Electrical Works

Electrical installation, testing, and commissioning for Cebu Mitsumi's 7.9 MW solar PV system in Danao — as subcontractor to Primary Structures Corp.

August 29, 2026
Cebu Mitsumi 7.9 MW Solar PV — Electrical Works

Overview

NCPSI installed the electrical equipment for the 7.9 MW solar PV system at Cebu Mitsumi, Inc. in Sabang, Danao City — engaged as electrical subcontractor to Primary Structures Corp.

Scope of works

  • Design and installation
  • Installation of power transformer, load break switch, ACC panel, cable trays, inverters, power cables, and electric poles
  • Testing and commissioning

Results

Completed the electrical installation, testing, and commissioning for the 7.9 MW solar PV system.
Client
Cebu Mitsumi, Inc.

Project Details

Client / Owner
Cebu Mitsumi, Inc.
Main Contractor
Primary Structures Corp.
Role
Electrical subcontractor — solar PV electrical works
Location
Sabang, Danao City, Cebu
Contract Value
₱2,300,000
Timeline
2023 (started August 2023)
Service Category
Solar PV