Cebu Mitsumi TY8 Expansion — Full EPC Substation

Full-EPC substation expansion for Cebu Mitsumi in Danao, Cebu — NCPSI's flagship end-to-end electrical project.

August 28, 2026
Cebu Mitsumi TY8 Expansion — Full EPC Substation

Overview

NCPSI delivered the full engineering, procurement, and construction (EPC) of the TY8 expansion for Cebu Mitsumi, Inc. in Sabang, Danao City — the end-to-end build of electrical transformers, control components, and the primary and secondary power lines for Transformer Yard 8.

Scope of works

  • Engineering design and procurement
  • Construction and installation of the control room, XLPE power cable, overhead primary lines, power transformers, and medium- and low-voltage switchgears, including land development of Transformer Yard 8
  • Testing and commissioning of the XLPE power cables, overhead power lines, power transformers, and MV/LV switchgears

Results

Completed the TY8 substation expansion end-to-end — engineering, procurement, construction, testing, and commissioning — delivered March 2023.
Client
Cebu Mitsumi, Inc.

Project Details

Client / Owner
Cebu Mitsumi, Inc.
Main Contractor
Testech Inc.
Role
Full EPC — engineering, procurement, construction, testing & commissioning
Location
Sabang, Danao City, Cebu
Contract Value
₱46,500,000
Timeline
March 2022 – March 2023
Service Category
Substation EPC