(+63) 917 777 0757 Book Appointment

Follow Us

S.I. Power Siquijor — Substation Preventive Maintenance

Preventive maintenance servicing of substation and HV equipment for S.I. Power Corp. in Siquijor — including plant-shutdown supervision and cable re-tapping.

August 29, 2026
S.I. Power Siquijor — Substation Preventive Maintenance

Overview

NCPSI carried out preventive maintenance servicing of the substation and high-voltage electrical equipment for S.I. Power Corp. at its Candanay Sur and Lazi facilities in Siquijor.

Scope of works

  • Supervision of the total plant shutdown, with implementation of safety and health protocols
  • Preventive maintenance servicing of transformers, high-voltage equipment, and controls
  • Re-tapping of the XLPE power cable from the power transformer to the vacuum circuit breaker (VCB)

Results

Completed the scheduled PMS of transformers and high-voltage equipment, including plant-shutdown supervision and XLPE cable re-tapping to the VCB.
Client
S.I. Power Corp.

Project Details

Client / Owner
S.I. Power Corp.
Role
Direct contract — preventive maintenance servicing (PMS)
Location
Candanay Sur & Lazi, Siquijor
Contract Value
₱810,000
Timeline
May 2021
Service Category
Preventive maintenance (PMS)